Skip to main content
Skip to main content

Cloud SCADA for Plants and Remote Sites

Transform traditional SCADA systems into modern, connected, and intelligent operations platforms.

Cloud SCADA
MQTT

Modbus, OPC UA and DNP3 data sent securely by a software gateway on the edge

0

Inbound ports opened on the plant network: the gateway connects outbound

5

Alarm channels: email, SMS, WhatsApp, voice call and push

99.9%

Platform availability, excluding scheduled maintenance

150,000+

Devices connected to the platform

2

Ways to run it: our cloud on AWS or your own servers

Not optional

What the law and the lenders already ask of this kind of installation.

  • Required by lawDirective (EU) 2022/2555 (NIS2), sectors of high criticalityApplies in the EU since 18 October 2024; in November 2026 Spain had not yet transposed it.
  • Required by lawSpain Royal Decree 3/2023 on drinking water, operational monitoringWater Safety Plans for the largest supply zones (types 1 and 2) were documented by 2 January 2025, with corrective measures due by 2 January 2027.
  • Required by lawSafe Drinking Water Act section 1433, as amended by America's Water Infrastructure Act 2018First certifications were due between March 2020 and June 2021 by size; reviews at least every 5 years after that, and the emergency plan within 6 months of the assessment.
  • Required by lawSpain Law 8/2011 on the protection of critical infrastructure
What each rule requires
01
150,000+

Connected devices

02
5

Alarm channels

03
99.9%

Platform availability

Utility SCADA Upgrade
01

Utility SCADA Upgrade

Water and power utilities modernize aging SCADA infrastructure.

Industrial Process Control
02

Industrial Process Control

Manufacturing plants enhance SCADA with IoT capabilities.

Complete SCADA Modernization Solutions

Bridge the gap between legacy SCADA and modern IoT platforms.

Protocol Gateway

Connect legacy PLCs and RTUs to modern platforms.

Cloud Integration

Extend SCADA capabilities to cloud-based analytics.

Enhanced Security

Modern authentication and encryption for critical infrastructure.

Mobile Access

Monitor and control from smartphones and tablets.

Advanced Analytics

AI-powered insights for operational optimization.

Remote Operations

Enable secure access from anywhere.

Regulations and certifications

What is required by law, what lenders and insurers ask for, and what is optional, with how continuous monitoring helps document it. The platform supports compliance; it does not certify it.

Required by law

Rules in force for the buildings and operators in their scope. Not meeting them can bring inspections, fines or loss of a licence.

  • Required by lawEuropean UnionLaw

    Directive (EU) 2022/2555 (NIS2), sectors of high criticality

    Annex I (energy, drinking water, waste water), articles 21, 23 and 34

    What it requires: Essential and important entities in energy, drinking water and waste water manage the risk to their network and information systems with measures that include incident handling, business continuity, access control and asset management. A significant incident gets an early warning within 24 hours, a notification within 72 hours and a final report within a month.

    Applies: Applies in the EU since 18 October 2024; in November 2026 Spain had not yet transposed it.

    If it is not met: Member States set maximum fines of at least 10 million euros or 2% of worldwide turnover for essential entities, and 7 million or 1.4% for important ones.

    How monitoring helps: Access by user and role with an audit trail, an alarm and event history that fixes when an incident was detected, which starts the 24 and 72 hour clocks, and escalation over five channels. We are a supplier you assess like any other; the platform does not make anyone NIS2 compliant.

    Official source
  • Required by lawSpainLaw

    Spain Royal Decree 3/2023 on drinking water, operational monitoring

    Article 36.3, Annex II parts A.2(e) and C.4, articles 59, 60 and 73

    What it requires: Disinfection runs automatically and continuously, operational monitoring gives the operator a quick view of treatment problems so pre-planned corrections can follow, and turbidity is monitored on line where a plant treats more than 10,000 m3 a day, with the daily mean and maximum reported to SINAC. Each operator keeps a Water Safety Plan with its records, updated every year.

    Applies: Water Safety Plans for the largest supply zones (types 1 and 2) were documented by 2 January 2025, with corrective measures due by 2 January 2027.

    If it is not met: Not drawing up the plan is a serious infringement, and taking no corrective action within 24 hours of a confirmed incident with a very serious health risk is a very serious one.

    How monitoring helps: Continuous logging of turbidity, free chlorine and pH from the analysers through the PLC, daily mean and maximum ready to report, and disinfection failure alarms over five channels, with the history kept as plan records. The operator still reports to SINAC.

    Official source
  • Required by lawSpainLaw

    Spain Law 8/2011 on the protection of critical infrastructure

    Article 13 and Annex (water and energy among the strategic sectors)

    What it requires: Operators designated as critical by the Ministry of the Interior draw up an Operator Security Plan and a Specific Protection Plan for each critical infrastructure, prove the measures through the relevant certification, appoint a security and liaison officer and allow inspections.

    How monitoring helps: Telemetry history, alarm and event logs, user access with an audit trail and multi-channel alerts at remote sites are operational evidence for those plans.

    Official source
  • Required by lawUnited StatesLaw

    Safe Drinking Water Act section 1433, as amended by America's Water Infrastructure Act 2018

    42 U.S.C. 300i-2(a), (b) and (d)

    What it requires: Community water systems serving more than 3,300 people assess the risk from malevolent acts and natural hazards, including their electronic, computer or other automated systems and their security, and their monitoring practices. They certify it to EPA, review it at least every 5 years and keep an emergency response plan with physical security and cybersecurity strategies.

    Applies: First certifications were due between March 2020 and June 2021 by size; reviews at least every 5 years after that, and the emergency plan within 6 months of the assessment.

    If it is not met: EPA can issue compliance orders, and breaching one carries a statutory civil penalty of up to 25,000 dollars a day.

    How monitoring helps: Tag history, the alarm and event log with who acknowledged each alarm, role-based access with an audit trail and escalation over five channels give evidence for the assessment and the plan. The assessment and its certification to EPA stay with the utility.

    Official source

Technical references

Standards and guides that become binding where a regulation or the authority adopts them, and the yardstick an inspector or auditor uses.

  • Technical referenceInternationalStandard

    IEC 62443-3-3

    System security requirements and security levels

    What it requires: The reference for securing industrial automation and control systems: zones and conduits, access control, data integrity and system hardening by security level.

    How monitoring helps: The gateway sits in its own zone, reads from the PLC network and sends outbound only, which keeps the plant network closed to the internet.

    Official source
  • Technical referenceInternationalStandard

    ANSI/ISA-18.2 and IEC 62682:2022, management of alarm systems

    Alarm lifecycle: philosophy, rationalization, implementation, monitoring and change management

    What it requires: Principles and processes for managing every alarm presented to the operator, built on a documented alarm philosophy. An alarm and event log, an alarm historian and performance metrics are functions of the alarm system.

    How monitoring helps: Alarm priorities, acknowledgement and escalation, plus the alarm and event log and its history, to review which alarms fire most and rationalize them.

    Official source

Cloud SCADA: how it works, when it makes sense and what water and energy rules ask for

Cloud SCADA moves supervision to the cloud: data collection, the historian, alarms and dashboards. Control stays where it belongs, in the PLCs and RTUs at each site. Operators get the whole operation in a browser, and adding a new site takes a gateway instead of a new server.

What the rules ask of water and energy operators

Water, waste water and energy are sectors of high criticality under NIS2. Operators manage the risk to their systems with incident handling, business continuity and access control, and a significant incident gets an early warning within 24 hours and a notification within 72. In November 2026 Spain had not yet transposed the directive, but it already applies across the EU, and operators designated as critical under Law 8/2011 keep security and protection plans for each critical infrastructure.

Drinking water adds operational rules. Royal Decree 3/2023 asks for automatic, continuous disinfection, operational monitoring that shows treatment problems quickly, on-line turbidity at large plants and a Water Safety Plan with its records; the largest supply zones must have their corrective measures in place by 2 January 2027. In the United States, community water systems serving more than 3,300 people assess the risk to their automated systems and their monitoring practices, certify it to EPA and review it every 5 years. IEC 62443 and ISA-18.2 are the usual references for securing the control network and managing alarms.

Who asksWhatData that answers it
Essential services in the EU (NIS2)Risk measures, warning in 24 h, notice in 72 hAlarm and event history, access by role, audit trail
Drinking water in Spain (RD 3/2023)Continuous disinfection, operational monitoring, safety planTurbidity, chlorine and pH logged with daily figures
Critical operators in Spain (Law 8/2011)Security and protection plansTelemetry, alarms and access records per site
US water systems (SDWA 1433)Risk and resilience assessment every 5 yearsHow automated systems are monitored, with evidence

The platform keeps the history and the alarm log and controls who does what; the risk assessments, the plans and the notifications stay with the operator.

Cloud SCADA vs on-premise SCADA

On-premise SCADACloud SCADA
Where it runsServers in the plant or control roomA cloud platform, or your own data center
AccessControl room workstations, VPN for remote workBrowser and phone, with user roles
Adding a siteNew servers, licenses and network linksA gateway or wireless sensors
Upfront costHardware and licenses per serverSubscription per device or site
If the internet link dropsKeeps running locallyLocal control keeps running and the remote view catches up when the link returns
Best fitFast closed-loop control in one plantSupervising many plants and remote sites

How the data gets to the cloud

  • Field: PLCs, RTUs, meters and sensors, as they are today.
  • Edge gateway: Reads Modbus, OPC UA or the PLC's own protocol and sends the data out over MQTT or HTTPS. More in how to integrate IoT with PLCs.
  • Wireless sensors: Sites with no PLC join with battery-powered sensors, as in LoRaWAN SCADA.
  • Platform: Historian, alarms, dashboards, reports and users, reachable from any browser.

Security

  • Outbound connections only: The gateway opens the connection, so no inbound port is opened on the plant network.
  • Encryption: Data travels over TLS from the gateway to the platform.
  • Roles and permissions: Each user sees and changes only what their role allows, and every remote command is logged.
  • Safety stays local: Interlocks and emergency stops never depend on the internet link.

Migrating without stopping the plant

Start read-only. Connect the gateway, mirror the tags that matter and run the cloud dashboards next to the current SCADA. Once alarms and reports match, move the teams that work remotely, and only then enable the remote commands you really need. The existing SCADA can stay as the local HMI for as long as you want.

For where SCADA is used today, see the five main applications of SCADA, with examples by sector and the most used software.

Sources

  1. Directive (EU) 2022/2555 (NIS2), Official Journal text on BOE
  2. Royal Decree 3/2023 on drinking water (BOE)
  3. Law 8/2011 on critical infrastructure (BOE)
  4. 42 U.S.C. 300i-2, community water system risk and resilience
  5. IEC 62443-3-3
  6. IEC 62682:2022, management of alarm systems

SCADA Systems IoT: Frequently Asked Questions

Everything you need to know about modernizing SCADA with IoT

Get Started

Modernize your SCADA today

Bridge legacy systems with modern IoT technology.